Building British Columbia.
Ops Jan 2014 (a)

VISSC and OPS Buildings, Victoria Shipyards, Esquimalt BC

Victoria Shipyard Improvement Project, Foundations and Building Fit out was started in August 2013 at the Equimalt Road location. The Operation Centre and the VISSC Shop and Office are located on one property but are .5 km apart. The construction sites are separated by the Esquimalt Graving Dock which created two separate jobsites for one project. Work Package #2 is for Foundations, sitework and Building fit o