Building British Columbia.
535-Final Constr- 2014-10-10   (16)

Elk Lake Dam Upgrade

This successfully completed dam for the CRD involved very challenging ground conditions, water ingress issues, and environmental concerns. The Park was operating during the construction term and disruption was minimalized.

Replacement of an existing dam structure with challenging soil conditions while mitigating environmental impact.